Panel & service upgrades in Winnipeg

More power, more room for circuits, and peace of mind.

Request a quote  |  Call 204-807-6695

If your breakers trip often, your panel is full, or you're adding an EV charger, a hot tub or a basement suite, your electrical service may be holding you back. Many older Winnipeg homes still run on 60A or 100A services that were never meant for today's loads. We'll tell you straight whether you need an upgrade or not.

What's included

  • Service upgrades: 60A or 100A up to 200A
  • Panel replacements, including Federal Pioneer Stab-Lok
  • Subpanels for garages, basements and additions
  • Load calculations before EV chargers or major appliances
  • Surge protection
  • Coordination with Manitoba Hydro for disconnect, reconnect and meter work

How it works

  1. Tell us about the job. Call or send the quote form, with photos if you have them.
  2. Free estimate. We look at the work and give you a clear, written price, delivered digitally. No minimum job size.
  3. We do the work. Permit pulled, work done to code, site left clean.
  4. Inspection and sign-off. We book the inspection and make sure it passes.

Have a Federal Pioneer panel?

Federal Pioneer Stab-Lok panels are common in older Winnipeg homes. If a home inspector or your insurance company has flagged yours, or you're planning work that needs more circuits, we can assess it and give you a free quote to replace it with a modern panel.

Financing for panel upgrades and EV chargers

We're a participating contractor for Manitoba Hydro financing. Some upgrades, such as panel upgrades and EV chargers, may qualify and can be paid back on your hydro bill. Ask us when you request your quote and we'll point you in the right direction.

Ask about financing

Common questions

How do I know if I need a panel upgrade?

Frequent tripping, a panel with no spare spaces, flickering lights when big appliances start, or plans for an EV charger, hot tub or suite are all signs. We'll check and tell you honestly.

How long does a service upgrade take?

The switchover itself is one day, with power off for part of it. There may be a prep day beforehand. We schedule it with you and coordinate with Manitoba Hydro.

Do you handle the permit and Hydro?

Yes. We pull the permit, book the inspection, and coordinate the disconnect and reconnect.

How much does it cost?

Every home is different, so we don't publish prices. We give free estimates.

Find out what your panel needs

Request a free quote  |  Call 204-807-6695